Blue Gate Antwerp is a logistics and office facility developed by Montea in Antwerp’s former petroleum harbor. The project demonstrates how a Sylva kit of parts can be effectively applied in industrial settings, delivering speed, performance, and precision in commercial construction.

Project Overview

The business park is located on a remediated brownfield site in the former petroleum harbor of Antwerp. According to the project’s developer, Blue Gate Antwerp Development NV, it is Belgium’s first ‘eco-effective, water-bound business park’. Meaning the site is designed to support circular operations and growth, offering multimodal access by road, water, and public transport.

Construction materials

For the construction of a new logistics and office facility that spans 2,800 m² on a single-storey structure, Blue Gate, Montea selected Sylva™ by Stora Enso, a prefabricated mass timber building kit for the two office at either end of the concrete warehouse.

The project used Sylva CLT Walls, Sylva Floors, and Sylva Roofs, with a total of 825 m³ of engineered timber delivered in just four weeks across nine shipments. These elements were key to achieving rapid assembly, reduced on-site waste, and a significantly lower carbon footprint.

The building is fully powered by renewable energy, including a 1.5 MWp solar installation, and heated via high-efficiency heat pumps. 

Awards and Recognition

The Blue Gate Antwerp project has received two prestigious awards so far:

-Realty Sustainable Building Award in the Industrial & Logistics category.

-EXPO REAL Impact Award 2024 in Munich, recognizing innovation and alignment with the New European Bauhaus initiative.

Area (m²) 2,800
Storeys 1
Products and Services Sylva™ CLT Floors and Roofs, Sylva™ CLT Walls
Product quality INV, IBI, NVI
Product volume (m³) 825
Product delivery duration (weeks) 4
Number of deliveries 9
Partner of Stora Enso CLT-S NV
Developer Montea
Architect Polo
Main contractor Verlest