Ybbs first Hotel the „Donau Lodge“ was built together with different regional companies. Because of the great collaboration, the developers were able to build the modern hotel in a short time of just 11 months. “The new hotel offers its visitors a beautiful and enjoyable location, which is located directly next to the Donau. Modern, stylish and sustainable living characterizes this hotel for which CLT is the ideal construction material”, explained Karin und Ernst Gruber-Rosenberger, executive director Babenbergerhof and Donau Lodge Ybbs. A total of 200 m³ CLT by Stora Enso in visual quality (VI) was used in the process.
Area (m²) | 1500 |
Storeys | 3 |
Units | 27 |
Products | Sylva™ CLT Floors and Roofs, Sylva™ CLT Walls |
Product quality | Visible quality (VI) |
Product volume (m³) | 200 |
Architect | Planorama |
MEP Designer | Pöchhacker |
Main contractor | Pöchhacker |
Specialist Timber Contractor | Pöchhacker |
Construction duration (months) | 5 |
Total construction development duration (months) | 11 |
Timber superstructure erection duration (weeks) | 12 |