Version of this project
Welcome to the Eclipse Leisure Centre in Spelthorne! Together with our partners, B&K Hybrid Solutions we have successfully delivered the UK’s largest wet and dry leisure centre built to the ultra-low energy Passivhaus standard. This achievement marks a significant milestone for energy-efficient public buildings. It is anticipated that the new centre will use between 60 and 70% less energy than typical leisure centres.
B&K Hybrid Solutions played a crucial role in this £50 million project by delivering the hybrid cross-laminated timber (Sylva™ by Stora Enso), glulam, and steel frame.
The Eclipse Leisure Centre, located in Staines-upon-Thames in Spelthorne UK offers a comprehensive range of facilities, including a 200-station gym, two swimming pools, a sports hall, squash courts, Clip 'n Climb, and rooftop football (soccer) pitches.
The mass timber solution is particularly well-suited for the Health and Leisure sector, especially as the kit of parts meets both sustainability and cost-certainty benefits.
Given that leisure facilities are high energy consumers and can be prone to comfort and overheating issues, adopting low-energy Passivhaus standards for the Eclipse Leisure Centre has enabled the local government to meet their sustainability goals within budget.
View more about aquatic centres built with mass timber:
Freemen's School Swimming Pool
Learn more
-Moisture Management Explained. Sylva Talks short video
-10 advantages with mass timber. Download the whitepaper
Publications
Eclipse Leisure Centre has been featured in several magazines:
Spa Business for its sustainability standards and energy efficiency
Sports Management covered its innovative design and Passivhaus certification
| Area (m²) | 9,290 |
| Storeys | 3 |
| Products and Services | Sylva™ CLT Floors and Roofs, Sylva™ CLT Walls, Preinserted lifting devices |
| Product quality | NVI, INV and VI |
| Product volume (m³) | 2,067 |
| Partner of Stora Enso | B&K Hybrid Solutions Ltd |
| Developer |
Spelthorne Borough Council Project manager and employer’s agent - Gleeds |
| Architect |
GT3 Architects PassivHaus designers - Gale & Snowden |
| Structural Engineer | Engenuiti |
| Main contractor | Wilmott Dixon |
| Specialist Timber Subcontractor | B&K Structures |
| Timber engineer | B&K Hybrid Solutions |
| Total construction development cost (€) | 35,120,000 |