Version of this project
This Project was designed and installed by our partner CLT-S. Elmer Daycare Center in Schaarbeek, Belgium, was built with CLT massive wood by Stora Enso in 2018. Altogether, 82 m³ of CLT were used for this building. The modern construction material has an extremely welcome side effect: the healthy climate within wooden structures creates a particularly pleasant indoor environment and has a demonstrably positive effect on students’ wellbeing. Additionally to the well-being, Elmer wants to increase social opportunities, participation of families and children by organizing neighborhood services and high-quality childcare in Brussels.
School Concept by Stora Enso
Let’s build a learning environment for the next generation.
Click here to learn more about our school concept.
Area (m²) | 1000 |
Products | Sylva™ CLT Floors and Roofs, Sylva™ CLT Walls |
Product quality | Industrial visible quality (INV) |
Product volume (m³) | 82 |
Product delivery duration (weeks) | 1 |
Number of truck deliveries | 2 |
Developer | Elmer VZW |
Architect | MUTAD Architecture & Urban Planning BVBA |
Main contractor | Troubleyn NV |
Specialist Timber Subcontractor | CLT-S |
Construction duration (months) | 1 |
Timber superstructure erection duration (weeks) | 2 |