Version of this project
Given that the kindergarten at the old location no longer met their existing needs, it was decided to build a new, larger, contemporary childcare centre within the municipality's school district.
Particular emphasis was placed on an ecological construction method. After consultation with the architects from Karl und Bremhorst Architekten, the building material chosen by our partner, Krückl Bau GmbH, was Sylva CLT Walls by Stora Enso.
Area (m²) | 1 |
Storeys | 2 |
Products | Sylva™ CLT Floors and Roofs, Sylva™ CLT Walls |
Product quality | VI |
Product volume (m³) | 335 |
Partner of Stora Enso | ZMP Holzbausysteme |
Architect | KARL UND BREMHORST ARCHITEKTEN |
Main contractor | KRÜCKL BAU GMBH |