Extension of the Andel Elite Dental Center

Hlohovec, Slovakia, Map
2019
Commercial
Partner of Stora Enso
CLT Slovakia

The extension of the Andel Elite Dental Center in Hlohovec (Slovakia) is characterized by the usage of KVH and CLT-massive wood elements by Stora Enso. The three-storey building has a rectangular receding floor plan with two superimposed floors. The extension of the centre is covered with a green roof and on the 2nd floor, there are the main areas of the examination and treatment rooms seamlessly connected to the waiting room. On the 3rd floor is located a lecture room, which also serves as a common room for employees. Facade is realized in Siberian larch which creates an excellent thermal insulation. Wood-aluminium window profiles with insulating safety triple glazing were used for all window openings. KVH and CLT as construction material ensures a fast and easy construction and contributes to a better indoor climate. Applied technologies such as groundwater cooling, air recuperation, etc. amplify the ecological principles. This project was completed in 2019, altogether the family dwelling comprises 245 m².

Area (m²) 245
Storeys 3
Units 1
Products CLT, KVH
Product quality Industrial visible quality (IBI)
Product volume (m³) 97
Partner of Stora Enso CLT Slovakia
Architect Ing. arch. Daniel Kubiš, Ing. arch. Mária Šebová, Ing. Martin Plošický
Structural Engineer Ing. Lubomír Staník
Main contractor Ing. Ľuboš Mesarč
Specialist Timber Contractor Ing. David Grajciar
Total construction development duration (months) 10
Timber superstructure erection duration (weeks) 2