At the docks of Ris Orangis in Paris was built 140 apartments using Stora Enso CLT massive wood. This project continues the trend for usage of massive wood in urban construction as a perfect alternative to concrete or brick. The project named "QUAI DE LA BORDE" has been completed in a total construction time of 13 months. Around 1 800 m³ of certified CLT by Stora Enso in non visible quality (NVI) were used in the building.
Residential Multi-storey Building Concept by Stora Enso
Multi-storey buildings in massive wood are high-performing, renewable structures that can help to meet the growing demand for new urban buildings and more efficient, sustainable construction.
Click here to learn more about our residential multi-storey building concept.
| Area (m²) | 8,800 |
| Storeys | 5 |
| Units | 138 |
| Products and Services | Sylva™ CLT Floors and Roofs, Sylva™ CLT Walls |
| Product quality | Non visible quality (NVI) |
| Product volume (m³) | 1,795 |
| Product delivery duration (weeks) | 12 |
| Partner of Stora Enso | Woodeum |
| Developer | Woodeum |
| Architect | Wilmotte & Associes |
| Structural Engineer | Sylva Conseil |
| MEP Designer | S2T |
| Main contractor | Eiffage Construction |
| Specialist Timber Subcontractor | Mathis |
| Construction duration (months) | 13 |
| Timber superstructure erection duration (weeks) | 12 |