Green Mews - 1-2 Family Dwellings - Brighton, UK

Green Mews

Brighton, UK, Map
2020
1-2 Family Dwellings

Three sustainable homes built in a tight space and framed in just three weeks.

​The site of these three new homes is completely enclosed by commercial and residential properties making excavating the heavy foundations challenging, disruptive and considered to be not commercially viable. But with lightweight Sylva CLT building kit by Stora Enso a building solution was found.

The homes are were engineered and installed by Olive Modular.

Biodiversity and energy efficiency are also considered with a sedum roof and the use of aerogel insulation. The development won an award from Sussex Heritage Trust after the properties achieved an outstanding Energy Performance (EPC rating of A:102).

Project Duration: 8 months

Area: 76 m² per unit

Area (m²) 210
Storeys 2
Products and Services Sylva™ CLT Floors and Roofs, Sylva™ CLT Walls
Product quality NVI (non-visual on both sides), BVI (visual on both sides) and VI (visual + non-visual)
Product volume (m³) 120
Developer Portland Glass Ltd
Architect DLS:ARCH Ltd
Structural Engineer Thorpe Engineering Ltd
Main contractor CLT Structures LLP
Olive Modular Ltd
Construction duration (months) 8
Timber superstructure erection duration (weeks) 3